Change your cover photo
Change your cover photo
This user account status is Approved

This user has not added any information to their profile yet.

M.Sc in Energy Science and Engineering (on going), Khulna University of Engineering and Technology (KUET); B.Sc in Petroleum and Mining Engineering, Shahjalal University of Science and Technology (SUST)
Assistant Professor
Department of Petroleum and Mining Engineering
Room No. 223, Bangabandhu Sheikh Mujibur Rahman Academic Building
Phone: +88-042162020 (Ext-243); +88-01791499985

Drilling Engineering, Reservoir Engineering, Well Logging, Petroleum Production Engineering and Energy Engineering.

Publications:
1. Md. Kamrul Islam and Md. Rafiqul Islam. “Stress characterization and support measures estimation around a coalmine tunnel passing through a jointed rock masses: constraints from BEM simulation”, International Journal of Advanced Geo-Sciences, 4(2) (2016), 21- 27
2. Md. Rafiqul Islam, Marzia Mohsin, Mir Md. Abdul Hannan, Mohammed Omar Faruque, Md. Kamrul Islam, Md. Abdur Rahman and Md. Ahsan Habib Shahin. “Strength Assesment of Concrete Cubes Containing Variable Mixtures of Portland Cement and Granite Dust of the Maddhapara Mine, NW Bangladesh”, American Journal of Civil Engineering, 4(6) (2016), 319-325.
3. Syeda Musarrat Jabin, Md. Minhaj Uddin Monir, S. M. Azmol Huda Mintu, Mohammad Tofayal Ahmed and Md. Kamrul Islam. “Diesel Fuel Quality Control of Titas Gas Field (TGF), Bangladesh”, International Journal of Petroleum and Geo-Science Engineering, 4(1) (2016), 28-34
4. Md. Aliur Rahman, Chowdhury Quamruzzaman, Md. Tofayal Ahmed, Md. Kamrul Islam, Md. Sadril Islam Khan, K.M. Imam Hossain and Chowdhury Sheebly Zaman. “3-Dimensional Modeling and Analysis of Mineable Seam of Khalashpir Coal Field, Rangpur, Bangladesh”, International Journal of Emerging Technology and Advanced Engineering, 7(7) (2017), 22-30
5. Md. Aliur Rahman, Chowdhury Quamruzzaman, Md. Tofayal Ahmed, Md. Kamrul Islam, Md. Sadril Islam Khan, K.M. Imam Hossain and Chowdhury Sheebly Zaman. “Coal Reserve Estimation and Selection of Mining Method in Khalashpir Coal Field, Rangpur, Bangladesh”, International Journal of Emerging Technology and Advanced Engineering, 7(7) (2017), 41-48

Edit Your Profile ? Please Login. Log In